Aluminium clamped for drilling
Rivnuts installed to chassis
Trim complete
I tried to fix the rivnuts at approximately 300mm centres for holding the side panels, with fixings being installed on the top, bottom and side near the rear arch.
Last job for the day was to drill and fix rivnuts in the scuttle for the fibreglass bulkhead to fix to.
No comments:
Post a Comment